ELSIS TS will reconstruct and upgrade gas distribution station in Palanga

Elsis ts

On February 19, 2018 UAB “Elsis TS” has signed an agreement with AB “Amber Grid” () for the reconstruction and modernization of the Palanga Gas Distribution Station (GDS). AB “Amber Grid” is the operator of Lithuania’s natural gas transmission system and is in charge of transmission of natural gas (transportation of natural gas through high pressure pipelines) to system users, and operation, maintenance and development of natural gas transmission system.

During the execution of this contract, the following work will be performed:

  • A description of Palanga GDS process control and automation and remote process control repair;
  • Automation ir control system repair works;
  • Electrical works;
  • Installation, connection and programming of SCADA equipment;
  • System start-up and tuning works;

 

According to the plan, all tasks will be completed by the 1st of September2018.