Subcontracting for modernization of the gas transmission system

Elsis ts

UAB Elsis TS has signed a subcontract with UAB Šiaulių Dujotiekio Statyba, which won the tender announced by AB Amber Grid “Installation of compartments for the control unit launch and reception and implementation of gas transmission system operative technological control (II stage), and services for the design preparation of these reconstruction work projects (Phases – technical work projects)”, for the implementation of technological process control and automation (SCADA) and for installation of electrical and active and passive corrosion protection.

During the implementation of the subcontract in 7 branches and sections of the main gas pipeline, where UAB Šiaulių Dujotiekio Statyba will replace inappropriate closing devices, pipeline connections and will make the pipeline ready for inner diagnostics, UAB Elsis TS will install technological process control and automation system (SCADA), passive protection against corrosion, will supply all required materials and equipment, perform various construction and reconstruction works related to aforesaid services, as well as system tuning, testing.

The project will contribute to the further modernization and development of the main gas pipelines operated by Amber Grid AB, ensuring the efficiency, safety and reliability of the gas transmission system.

The value of the contract is over EUR 925 000 excluding VAT. The work will be performed in several phases and the subcontract is scheduled to be completed by December 22, 2021.